ASSESSMENT OF LIQUIDATED DAMAGES CLAUSES IN ROAD CONSTRUCTION CONTRACT IN ONDO STATE, NIGERIA.

Show simple item record

dc.contributor.author ADEYEYE, OYINLADE CECILIA
dc.date.accessioned 2020-11-05T08:20:55Z
dc.date.available 2020-11-05T08:20:55Z
dc.date.issued 2017-02
dc.identifier.uri http://196.220.128.81:8080/xmlui/handle/123456789/1159
dc.description M. TECH en_US
dc.description.abstract The study assessed liquidated damages clauses, with a view to examining the use in controlling delay. It provided an insight on the use of liquidated damages clause in road construction contracts. The study identified causes of delay in road construction projects and examined the effects of such delay on road projects. It assessed the effects of liquidated damages clauses in road construction projects. The survey method was adopted for this work through questionnaire. 140 questionnaires were distributed to contractors, clients, consultants and quantity surveyors in road construction project in Ondo State while 111 were returned. The data collected were analyzed in ranking form to determine the severity of the causes and effects of delay in road construction projects. Spearman Correlation were used to assess the relationship that exist between liquidated damages and delay . The result revealed that the most significant effect of liquidated damages clauses is that it determine how risk of delay is allocated with a mean score of 4.35, agreements by the parties as to the appropriate compensation for breach of contract with mean score of 4.29 and prevent/ minimize delay with score of 4.25. A correlation coefficient of .468 i.e. (r=0.468) indicates that there is a strong positive relationship between liquidated damages clause and delay in road construction projects in Ondo State, Nigeria. The relationship were found to be statistically significant at 0.05 level. The study concluded that while some of these effects has impact on road project delivery time, in reality, it remains to be felt how liquidated damages clause minimize delay in road project. The study recommended that liquidated damages clause should be specified, communicated and agreed upon by parties as a penalty to control stakeholders in execution of road project so as to avoid incessant project delay or abandonment. en_US
dc.description.sponsorship Futa en_US
dc.language.iso en en_US
dc.publisher Federal University of Technology, Akure en_US
dc.subject LIQUIDATED DAMAGES en_US
dc.subject ROAD CONSTRUCTION en_US
dc.title ASSESSMENT OF LIQUIDATED DAMAGES CLAUSES IN ROAD CONSTRUCTION CONTRACT IN ONDO STATE, NIGERIA. en_US
dc.type Thesis en_US