DEVELOPMENT OF AN EMPIRICAL MODEL FOR JOBSHOP FLOW TIME AND DUE-DATE PREDICTION

Show simple item record

dc.contributor.author AKINNULI, OLUFEMI BASIL
dc.date.accessioned 2026-04-30T11:26:30Z
dc.date.available 2026-04-30T11:26:30Z
dc.date.issued 1998-08
dc.identifier.uri http://196.220.128.81:8080/xmlui/handle/123456789/5882
dc.description x, 135p. : ill. ;30cm en_US
dc.description.abstract A computer software was developed and tested for validation for jobshop flowtime and due date prediction. The software utilises data from shop floor which are analysed to predict expected waiting time on each individual machine on a periodic bases. Projection of these waiting times are made for future flow time prediction by using moving averages. The methodology employed implicitly accommodates job characteristics, shop status, system characteristic as well as delaying factors external to the shop. This software is capable of prescribing a range of due-dates to reflect the best, most likely and worst case possible scenarios with their times. When the total theoretical time of a job was 570 minutes, with the arrival date and time 24/08/98 and 8:00 hours respectively the software was able to predict the due-dates for best case scenario, most likely scenario and worst case scenario thus: Best case Scenario due-date: 24/08/98 Time: 12:08 hours Most likely Scenario due-date: 25/08/98 Time: 12:08 hours Worst case Scenario due-date: 26/08/98 Time: 13:08 hours This range will greatly assist management in negotiations with prospective customers. Improving performance of job shops and their ability to execute jobs within due-dates. en_US
dc.description.sponsorship THE FEDERAL UNIVERSITY OF TECHNOLOGY AKURE, ONDO STATE, NIGERIA. en_US
dc.language.iso en en_US
dc.publisher FEDERAL UNIVERSITY OF TECHNOLOGY, AKURE, ONDO STATE, NIGERIA en_US
dc.subject JOBSHOP FLOW en_US
dc.subject SYSTEM CHARACTERISTICS en_US
dc.subject DUE DATE SETTING en_US
dc.subject DETERMINATION OF WAITING TIME en_US
dc.subject SOFTWARE DESIGN AND IMPLEMENTATION en_US
dc.title DEVELOPMENT OF AN EMPIRICAL MODEL FOR JOBSHOP FLOW TIME AND DUE-DATE PREDICTION en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search FUTAspace


Advanced Search

Browse

My Account