RURAL ELECTRIFICATION IN OYO STATE OF NIGERIA:

Show simple item record

dc.contributor.author AJEIIGBE, AKINADE JACOB
dc.date.accessioned 2026-08-05T15:24:48Z
dc.date.available 2026-08-05T15:24:48Z
dc.date.issued 2010-04
dc.identifier.uri http://196.220.128.81:8080/xmlui/handle/123456789/5997
dc.description xx, 62p. : ill. ; 30cm en_US
dc.description.abstract According to state reports only 45% of Nigerian populations have access to electricity and only 10% of rural dwellers have access electricity. 24% of the population and vast developmental potentials are in the rural areas of Sates such as Oyo, justifying the need of this study. The aim of this study is to assess the transmission capacity of the existing rural primary feeder network (33 kV) and to determine ways of reinforcing the 33 kV network by thermal and voltage requirement for adequate distribution of electricity in view of prospective full scale electrification and power demand of the rural areas of Oyo State. The translations of results are expected to be useful for electrification planners. This work is done by using data of maximum power demand allocations to fully electrified areas of the State to compute expected range of power demand per capita, and applying normal mode simulations and calculations by iterative approximation methods (matrix) solutions of the equations of state. The following conclusions were made from an analysis of the results: and direct The load densities per capita range from an expected 0.011 kW to 0.094 kW; expected potential load demand for the whole state is about 534 MW (this is huge compared to the total 103.7 MW supplied by the utility); at 33kV the capacities of these networks are inadequate due to overloading of lines (55%) and critical bus voltages (82%); the total injection substation capacity (225 MVA) is inadequate for meeting the potential demand of Oyo State, including electrification of the rural areas; and upgrading the voltage of the existing network will improve the distribution capacity significantly and solve overloading and voltage problems. Consequently, the following recommendations were made: the 33 kV network should be reinforced by upgrading to 132 kV; the total substation capacity in Oyo State should be increased by installing more 132 kV substations to relieve the existing fully loaded ones. Otherwise, this will serve as a constraint to any full scale rural electrification intending to feed from the national grid. development in Oyo State intending to feed from the national grid. en_US
dc.description.sponsorship FEDERAL UNIVERSITY OF TECHNOLOGY, AKURE, ONDO STATE, NIGERIA en_US
dc.language.iso en en_US
dc.publisher FEDERAL UNIVERSITY OF TECHNOLOGY, AKURE, ONDO STATE, NIGERIA en_US
dc.subject Rural Electrification en_US
dc.subject Grid-connected en_US
dc.subject Conductors en_US
dc.subject Insulator en_US
dc.subject Rural Distribution Transformer en_US
dc.title RURAL ELECTRIFICATION IN OYO STATE OF NIGERIA: en_US
dc.title.alternative ASSESSEMENT OF EXISTING 33kV FEEDER NETWORK CAPACITY en_US
dc.type Thesis en_US